Skip to end of banner
Go to start of banner

What is a Schedule and how to configure them

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 9 Next »

For SARJ, a Schedule is a combination of rules that applies to a particular functional area/team/location.

A Schedule is a way to isolate that group to apply the rules of auto-assignment.

Any number of Schedules can be created for a project, and each Schedule can be activated/deactivated based on your requirements. You can also copy an existing Schedule while creating a new one.

Schedule Settings

Issue Types: For every project, you get to configure Issue Types such as Story, Epic, Task, Sub-task, Bug, etc. Feel free to choose more than one, or even all Issue Types as per your need.

Issue Status: Similarly, with Issue Statuses, SARJ will share options of configured Issue Statuses such as ‘To-do’, ‘In progress’, ‘Done’, and the like.

Please note, if you select more than 1 Issue Type, the app will present before you a list of common Issue Statuses for both. For instance, if Task comprises 5 Issue Statuses and Epic has 4, and the two have 3 common issue statuses, the admin will have to choose from the overlapping ones.

A Schedule will be triggered only when a selected issue type (such as Story, Task, etc.) moves to the selected status (such as ‘To-do’).

Activating Schedules

You can activate a Schedule by toggling the status of the schedule to ‘yes’ (selected as green).

In scenarios where you create a schedule but do not want to launch it, or keep the configured item ready as a part of a simulation, simply disable the button. Click on save, and you’re good to go!

As soon as you click save, the ‘Add Rotation’ button gets activated. Consider this s a trigger, and move on to create configurations for a rotation.

  • No labels