For SARJ, a Schedule is a combination of rules that applies to a particular functional area/team/location.
Any number of Schedules can be created for a project, and each Schedule can be activated/deactivated based on your requirements. You can also copy an existing Schedule while creating a new one.
Schedule Settings
Issue Types: For every project, you can configure Issue types such as Story, Epic, Task, Sub-task, Bug, etc. Feel free to choose more than one, or even all as per your need.
Issue Status: Similarly, with Issue Statuses, SARJ will share options of configured Issue Statuses such as ‘To-do’, ‘In progress’, ‘Done’, etc.
Please note, if you select more than 1 Issue Type, the app will present before you a list of common Issue Statuses for both. For instance, if Task comprises 5 Issue Statuses and Epic has 4, and the two have 3 common issue statuses, the admin will have to choose from the overlapping ones.
A Schedule will be triggered only when a selected issue type (such as Story, Bug, etc.) moves to the selected status (such as ‘To-do’).
On to the next step -
Once your schedule is created, you will be redirected to create a rotation
Activating Schedules
You can activate a Schedule by toggling the status of the schedule to ‘yes’ (selected as green).
In scenarios where you create a schedule but do not want to launch it, or keep the configured item ready as a part of a simulation, simply disable the button. Click on save, and you’re good to go!
As soon as you click save, the ‘Add Rotation’ button gets activated. Consider this s a trigger, and move on to create configurations for a rotation.